Credit: AFP
Samsung speeds P5 Fab 2 construction as memory chip shortage looks to last through 2028
Samsung Electronics plans to begin structural work at its P5 Fab 2 facility in Pyeongtaek, South Korea, in January 2027, accelerating its memory capacity expansion as chip shortages are expected to persist through 2028, DealSite reported.
本站仅提供摘要,完整内容请阅读原文(版权归原媒体所有)
https://www.digitimes.com/news/a20261105VL231/samsung-2028-2027-equipment-production.html
相关阅读
11-06 11:46
11-06 09:15